{"product_id":"hem-and-boo-sports-training-long-lead-reflective-in-orange","title":"Hem and Boo Sports Training Long Lead - Reflective in Orange","description":"\u003cp\u003eThe Hem and Boo Sports range is crafted from tightly woven, durable nylon, offering a sporty feel. They feature reflective elements for enhanced visibility during early morning and autumnal evening walks, making them ideal for mastering recall and distance control training. Coordinate the sports harness, collar, and training lead for a complete system.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e* Recall and Distance Control\u003c\/strong\u003e\u003cstrong\u003e\u003cbr\u003e\u003c\/strong\u003e\u003cstrong\u003e* Durable and Strong\u003cbr\u003e\u003c\/strong\u003e\u003cstrong\u003e* Reflective for Safety\u003c\/strong\u003e \u003c\/p\u003e\n\u003cp\u003e3 Lengths, 5M x 25mm, 10M x 25mm, 15M x 25mm\u003c\/p\u003e","brand":"Hem \u0026 Boo","offers":[{"title":"5 Metre","offer_id":54116218798421,"sku":"38058","price":14.99,"currency_code":"GBP","in_stock":true},{"title":"10 Metre","offer_id":54116218831189,"sku":"38059","price":16.99,"currency_code":"GBP","in_stock":true},{"title":"15 Metre","offer_id":54116218863957,"sku":"38060","price":19.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1054\/6305\/4677\/files\/sports-training-long-lead-reflective_5m_1.jpg?v=1781169560","url":"https:\/\/www.petcetera.co.uk\/products\/hem-and-boo-sports-training-long-lead-reflective-in-orange","provider":"Petcetera Etc","version":"1.0","type":"link"}